Hills develops new Materials Recover Facility (MRF) for Wiltshire
Work is underway on the new materials recovery facility in Wiltshire, designed by Turmec.
Hills Waste Solutions has commissioned Turmec to supply and install the MRF plant, which will have the capacity to process 20 tonnes per hour of mixed dry recyclables (MDR).