Turmec wins a contract to provide advanced RDF processing capabilities for Sharp Skips at Rainham, Essex East London

Turmec wins a contract to provide advanced RDF processing capabilities for Sharp Skips at Rainham, Essex East London

Turmec, the market leader in designing, building and installing waste processing and recycling solutions, is delighted to announce that it has been awarded a significant contract by Sharp Skips Ltd to design and install an advanced waste processing unit at their flagship facility at Rainham, Essex […]

Out of the ashes – EfW plant maximises recovery

Out of the ashes – EfW plant maximises recovery

A new energy-from-waste plant has been equipped with systems designed and built by Turmec to handle and process bottom ash.

The state-of-the-art UK facility will process 190,000 tonnes of municipal waste a year when fully operational, exporting around 14.5MW of energy to the national grid.

Page 1 of 1 1